Friday, August 15, 2008
Brickie is Finished
The outside brick work is finished and all that needs to happen now is the painting of the garage for the old house and above the windows. Murray has been around and is talking about trying to get the driveways done but it will not stop raining. I would like to get the fences done soon as well as that would really feel like something major is happening.
Bathroom cupboard: This is in the corner with the basin unit out to the left. I had this made to fit as all the ones you could prepurchase did not fit a folded towel. The bottom of this is a pull out drawer for the laundry. Quite neat if I think so myself.
Next step on the bathroom saga is the tile story. I had finally chosen the tiles needed and given them to murray to order. He did so and the wall tile was out of stock - not in until october. Mum and I went to New Plymouth to have a look at another option, which we duly chose after much debate. fast forward to the monday and the guy from the tile shop rang to say that someone had been in on saturday and ordered all of the tiles I had chosen and there would not be enough left for me. So onto the third choice and do you know what they are a 1/3 of the price as well. yeah!!! at least the budget is pleased.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment